>

Logistics Warehouse Steel StructuresDesign · Fabrication · Installation

High racking, high turnover, strict fire zoning; stringent floor flatness and load requirements; loading canopies and docks often built in the same phase

Get a Logistics Warehouse solution

Uzbekistan is a doubly landlocked country and a focus of Central Asian infrastructure investment: the World Bank has 24 active projects there with net commitments of about USD 5.4 billion, and the IFC portfolio is around USD 1 billion, mainly in energy, infrastructure and manufacturing. Uzbekistan also sits in an active seismic belt — the Andijan (1902), Tashkent (1966) and Fergana (2011) earthquakes were destructive — so seismic design is the first constraint on any steel structure.

Conformity requirements for Uzbekistan

Technical regulation and conformity assessment are handled by the Agency for Technical Regulation (ATR). Imported goods must have their standards registered nationally, and certificates can be valid for up to three years. Many standards still follow the Soviet system and are being updated, so export documents must line up with local conformity assessment.

Seismic design is the first constraint here

Uzbekistan lies in an active seismic belt and has repeatedly suffered destructive earthquakes. Steel construction is inherently favourable in seismic terms — light and ductile — but the system and connections must follow local seismic requirements.

Logistics: rail and multimodal routes

Uzbekistan is doubly landlocked. Chinese cargo usually enters through the Dostyk rail crossing in Kazakhstan, or is transshipped via the Caspian (Aktau / Kuryk) or Iranian ports. Knocked-down shipments with member marking allow staged delivery to match the site programme.

Frequently asked questions

What certification is needed to export to Uzbekistan?
The Agency for Technical Regulation (ATR) is responsible. Imported goods must have their standards registered nationally, and a certificate can be valid for up to three years. We confirm the applicable standards and registration requirements at project start and prepare the technical file to avoid delays at customs.
Can you build long-span buildings in a seismic zone?
Yes. Span and structural system are decided together: we select ductile systems and connections to the local seismic requirements, then optimise span, loads and process needs. We issue the calculations and strengthen column bases and bracing for seismic action.
How is logistics arranged for a landlocked country?
Uzbekistan is doubly landlocked. The main routes are the Dostyk rail crossing in Kazakhstan, or multimodal transshipment via Aktau / Kuryk on the Caspian or Iranian ports. We quote rail and multimodal options and support staged delivery in erection sequence.
Need a steel structure solution and quotation for this market?

Send the span, use, city and site conditions — we reply with a seismic structural solution and budget price within 48 hours.

Enquire now Browse all products