Agri-PV Steel StructuresDesign · Fabrication · Installation

Elevated PV racks plus farming space; must accommodate machinery passage and daylight

Get a Agri-PV solution

For agrivoltaics steel structures, success is rarely about whether it can be built — it hinges on whether load assumptions match real service conditions and whether connection details suit the operating environment. Agronomic requirements and rack layout must be coordinated, and foundation work must not damage the arable soil layer

Agrivoltaics Steel Structures: Service Conditions Shape the Design

Elevated PV racks plus farming space; must accommodate machinery passage and daylight

That's why agrivoltaics projects can't rely on generic drawings: with the same span, different load conditions and service environments can call for entirely different structural and envelope solutions. We usually start with a requirements brief — use, span, cranes, equipment and site conditions — and then recommend a structural concept.

Recommended structural system

Elevated steel truss racks with 3-5 m clear height, in 8-20 m bay units. This is currently the best-balanced option for agrivoltaics projects in terms of cost-effectiveness and reliability — it controls steel weight while allowing fast on-site assembly.

Key parameters to confirm first

Wind uplift on racks is significant; uplift resistance and foundation pull-out must be verified against local wind pressure. Once these parameters are fixed, the steel weight and budget range are essentially locked in; the rest of the design is optimization within that framework.

Design & Construction Key Points

Agronomic requirements and rack layout must be coordinated; foundation work must not damage the arable soil layer

Our approach is to build these constraints into the design input at the concept stage rather than patching them in during construction drawings. Experience on overseas projects means we deliver calculation notes, material certificates and inspection records together with the drawings, ready for permitting, acceptance and third-party inspection.

Cost Structure & Key Drivers

The cost of agrivoltaics projects consists mainly of four parts: the primary steel structure (steel weight and fabrication), the envelope system (roof and wall panels, insulation, daylighting and ventilation), foundations and floor slabs, and shipping and installation. The primary structure typically accounts for 40%-60% and the envelope 20%-35%, with the rest going to foundations, slabs, shipping and installation.

Key cost drivers: span and column spacing (steel weight rises noticeably with each span step), crane configuration, corrosion protection class (C4-C5 required in coastal or chemical environments), and whether mezzanines or equipment platforms are included.

Scope of Services

Standard Specifications & Technical Parameters

Applicable span9-40 m (economical span 18-30 m)
Eave height4-12 m (higher on request)
Column spacing6m / 7.5m / 8m / 9m
Steel gradeQ235B / Q355B, with mill certificate and heat numbers
Surface treatmentShot blasting to Sa2.5; hot-dip galvanizing or zinc-rich epoxy primer + topcoat
Corrosion protection classStandard C3 / C4-C5 for coastal and chemical environments
Applicable standardsGB 50017 / GB 50009 / EN 1090 / AISC
CertificationEN 1090 CE and ISO 9001; SGS / BV third-party inspection available

Delivery Process

  1. 1. Requirements briefingProvide site conditions, span, cranes and process requirements — we recommend a structural concept and a budget range
  2. 2. Design & quotationDesign confirmed, drawings and calculation reports issued, with itemized quotation incl./excl. tax
  3. 3. Factory fabricationProduction scheduled from drawings; key milestones photographed and archived; resident or third-party inspection available
  4. 4. Shipping & installationOversize transport to site; technical team supervises or contracts the erection; handover documents after acceptance

Agrivoltaics FAQ

What structural system is typically used for agrivoltaics steel structures?
The common approach is elevated steel truss racks with 3-5 m clear height, in 8-20 m bay units. The right choice depends on span, crane configuration, load conditions and site conditions; strong wind uplift on racks — with uplift resistance and foundation pull-out to verify against local wind pressure — is the first parameter to confirm.
How are loads determined for agrivoltaics projects?
Loads follow current codes combined with actual process requirements: strong wind uplift on racks, with uplift resistance and foundation pull-out verified against local wind pressure. Elevated PV racks plus farming space; must accommodate machinery passage and daylight.
What is the approximate cost per square meter for agrivoltaics?
Cost depends on span, steel weight, envelope design and corrosion class — there is no single unit price. Agronomic requirements and rack layout must be coordinated, and foundation work must not damage the arable soil layer. Send us your process requirements and site conditions and we'll reply within 24 hours with a budget range and a detailed cost breakdown.
What is most commonly overlooked when building agrivoltaics steel structures?
Agronomic requirements and rack layout must be coordinated; foundation work must not damage the arable soil layer. This must be considered at the concept stage; patching it in during construction usually means reworking completed parts.
Can you handle export or out-of-town projects?
Yes. Our factory is in Shanghai and we have exported to more than 60 countries, with complete experience in oversize transport, reinforced packing and export customs; technical teams can supervise or fully contract on-site erection.
How long does fabrication usually take?
Typically 25-45 days in the factory after drawing confirmation; on-site erection runs about 2,000-3,000 m²/week depending on span and connection complexity.
Need an agrivoltaics steel structure solution and quotation?

Send us your span, intended use and site conditions — within 24 hours you'll get a structural concept recommendation and a budget range.

Get a quote now Browse all products

Agri-PV — Steel Structure Engineering in China

Elevated PV racks plus farming space; must accommodate machinery passage and daylight. Recommended structural system: elevated steel truss racks, 3-5 m clear height, 8-20 m bay units. Key parameters to confirm: significant wind uplift on racks — uplift resistance and foundation pull-out must be verified against local wind pressure.

Request a quotation →