France is one of the core EU markets, with large logistics distribution centres, data centres, retail warehousing and agricultural facilities driving most steel structure demand. The French logistics network is built around regional distribution centres, which place a clear premium on long span, fast build and expandability — exactly where steel excels. Entering France requires design to Eurocode 3 and French practice, and supply to the EN 1090-1 execution class with CE marking.
Demand and delivery practice in France
Retail and e-commerce logistics are highly developed in France, and regional distribution centres are large with high clear heights, typically combining long-span portal frames with high-bay racking; data centre and food cold chain investment is also steady. French projects value whole-life cost and build quality, and steel's prefabrication, recyclability and speed fit local requirements well.
- DCs commonly use 30–40 m portal frames with high-bay racking and multiple loading docks
- Phased expansion: reserve a bay for later extension without demolishing existing structure
- Food plants and cold stores use PU edge-sealed or rock wool panels for both insulation and fire performance
Codes, wind and snow loads
Design follows EN 1993 (Eurocode 3) with French National Annexes and loads follow EN 1991, consistent with French engineering practice; components entering the market are produced to EN 1090-1. France is influenced by both the Atlantic and the Mediterranean: coastal areas have higher wind loads and mountain areas higher snow, with S235 / S355 steel common.
- Wind/snow: values from the project region, with correspondingly enhanced roof and cladding fixing
- Corrosion: C3 inland and C4 coastal, hot-dip galvanised or galvanised plus coating
- Fire: coatings or boards to French fire resistance requirements for the building use
- Cladding: insulation and waterproofing for the local climate, with airtightness and thermal performance
Delivery and logistics: Shanghai / Ningbo to Le Havre, Marseille
Detailing and fabrication take place at our Shanghai and Jiangsu facilities; knocked-down members ship from Shanghai or Ningbo to Le Havre and Marseille with marking drawings, packing lists and erection guidance.
- Detailing 7–10 days, fabrication 25–40 days, ocean about 30–38 days
- Production to EN 1090-1 EXC2 / EXC3 with factory production control (FPC) documents
- High loading density: fewer containers per tonne and lower unit freight cost
Frequently asked questions
Can you issue calculations to Eurocodes?
How is the EXC class decided for French projects?
Who handles site erection?
Send the span, use and site conditions — we reply with a structural solution and budget price within 48 hours.