Portal Frame Workshop (PEB)Portal Frame Workshop (PEB)

Pre-engineered building system with factory-welded primary members and bolted site assembly. Large span, optimized steel usage, fast delivery.

Get a Portal Frame Workshop (PEB) quotation

Pre-Engineered Building (PEB) Workshops — pre-engineered steel systems with primary members shop-welded and assembled on site with high-strength bolts; long spans, economical steel use and fast delivery — the mainstream choice for export factories.

Product Overview

Pre-engineered steel systems with primary members shop-welded and assembled on site with high-strength bolts; long spans, economical steel use and fast delivery — the mainstream choice for export factories. This product range suits a wide variety of applications; key features include spans up to 40 m and Q355B/Q235B steel. We re-verify parameters against your actual project conditions instead of applying standard specifications blindly — that's what prevents problems later on.

Specifications & Technical Parameters

Applicable span9-40 m (economical span 18-30 m)
Eave height4–12m
Steel gradeQ235B / Q355B, with mill certificates
Applicable standardsGB 50017 / EN 1090 / AISC

Complete Compatible Systems

A single component rarely works in isolation. Pre-engineered building (PEB) workshops usually need to be engineered together with the primary structure, envelope system, connections and coating system to deliver overall performance. We supply structure and envelope as one integrated package, avoiding the blurred responsibilities of multi-vendor supply.

Manufacturing & Quality Control

The factory runs CNC cutting, automated assembly, submerged-arc welding and shot-blasting lines with a monthly capacity of 6,500 t. Key processes (bevels, welds, coating thickness) are recorded and archived piece by piece; resident or third-party inspection can be arranged.

Delivery & Packaging

Standard delivery flow: drawing confirmation → production scheduling → factory inspection → reinforced packing (40HQ containers or break-bulk for export projects) → transport and handover. Member numbers match the packing list one-to-one, so crews erect by number and on-site checking time drops significantly.

FAQ

Can pre-engineered building (PEB) workshops be customized to drawings?
Yes. We support build-to-print customization (OEM/ODM): send drawings or specifications and we handle detailing, quotation and production scheduling. For volume orders we recommend confirming a technical agreement first, covering material, tolerances, coating and packaging.
What is the lead time for pre-engineered building (PEB) workshops?
Standard configurations: 25-45 days fabrication after drawing confirmation; export projects add oversize transport and customs time (about 3-10 days depending on destination port). Book capacity 2-3 weeks early in peak season.
What quality and inspection certificates come with pre-engineered building (PEB) workshops?
Each shipment includes mill certificates (with heat numbers), certificates of conformity and inspection records. Third-party resident inspection by SGS / BV is supported, with documentation to EN 10204 3.1.
Can pre-engineered building (PEB) workshops be exported? How is it packed?
Yes — our products ship to more than 60 countries. Members are bundled and reinforced into 40HQ/open-top containers or shipped break-bulk; we provide packing lists, packing photos and securing plans.
How is the price of pre-engineered building (PEB) workshops calculated?
We price item by item based on steel weight, fabrication steps, coating class and packing/transport calculated from drawings or spec lists, with both tax-inclusive and tax-exclusive options, detailed down to member weights.
What applications are pre-engineered building (PEB) workshops suitable for?
Pre-engineered steel systems with primary members shop-welded and assembled on site with high-strength bolts; long spans, economical steel use and fast delivery — the mainstream choice for export factories.
Need a quotation for pre-engineered building (PEB) workshops?

Send drawings or a specification list and we'll reply within 24 hours with an item-by-item quotation and lead time.

Get a quote now Browse all products

Portal Frame Workshop (PEB)

Pre-engineered building system with factory-welded primary members and bolted site assembly. Large span, optimized steel usage, fast delivery.

Get a quotation →  |  View project cases