21,000 m² of two-level retail space plus a parking deck — main structure completed in just 97 days.
This two-level retail building covers about 21,000 m², using a steel frame with composite floor decking: 9m column grid at ground level and a 24m column-free sales hall.
The challenge was schedule — the owner required opening before the peak shopping season. With highly detailed member breakdown and an all-bolted, hot-work-free site process, the main structure was topped out 97 days after mobilization, roughly 60 days faster than a conventional scheme.
Interior and MEP works are now underway. It proves once again that in retail, schedule is money.