Capability Upgrade: BIM Detailing Team Expanded to 12 Engineers

Company News Xionglan Engineering Team

3D models feed CNC lines directly: complex joint drawings now take 2 days instead of 5, and clashes are caught before cutting.

This month Xionglan expanded its BIM detailing team to 12 engineers, all working in Tekla Structures.

The workflow has changed: members, joints and bolt holes are fully modeled in 3D, and the model outputs CNC data directly to the cutting and drilling lines, reducing manual lofting errors. Problems that used to slip through — crane girder stiffener interferences, knee-brace clashes — are now caught before any steel is cut.

Direct value for clients: complex joint drawings in 2 days instead of 5, and much faster answers to drawing queries. We exchange IFC and DWG files freely, so your local design institute can collaborate easily.

steel BIM detailingtekla structures
Need a steel structure solution and a quote?

Shanghai Xionglan Steel Structure · Exported to 60+ countries · EN 1090 CE certified · Engineer reply within 24 hours

Talk to an engineer View product systems